Manufactured Equipment
Pressure / Vacuum Valve Test Panel
Details:
Part Number 20-51
Meets all the requirements of CARB Test Procedure TP-201.1E
This tester creates the required flows and positive/negative pressures using Nitrogen gas and a venturi. No motor-driven vacuum pump is required, so the system can be used in hazardous environments.
Pressure / Vacuum Valve Test Panel
Details:
Part Number 20-51
Meets all the requirements of CARB Test Procedure TP-201.1E
This tester creates the required flows and positive/negative pressures using Nitrogen gas and a venturi. No motor-driven vacuum pump is required, so the system can be used in hazardous environments.